Parts for older machines, ready to make before they break.
We build a digital spare-parts warehouse for your line. Every part your line cannot run without gets a 3D scan, dimensions, material, a drawing and a proven way to make it. The files sit on a secured server in Poland and you open them from a laptop or a phone. When something breaks, all that is left is making it.
What does a day of a stopped line cost?
An example from a line run by eight people on one shift, in a company of about 30. Every plant has its own figure, and we work it out together on the review day.
- c. PLN 1,300per hour of downtime: eight people waiting, c. PLN 500, then overtime to make up the output, c. PLN 800
- PLN 10,400per day of downtime, on one shift
- 69%of plants have unplanned downtime at least once a month
Amounts: an estimate for the line described above, based on Statistics Poland 2026 (manufacturing wages) and Eurostat 2024 (hourly labour cost in small firms). 69%: ABB, Value of Reliability 2023, a survey of 3,215 maintenance professionals.
Why can't you just buy that part?
- 01The machine maker no longer makes it, or the wait is weeks.
- 02Nobody wrote the drawings down. The knowledge sits in the heads of the maintenance team.
- 03A drawing from scratch on the day of the failure means days before anyone starts machining.
How it works
One day at your plant
We come to your plant for one day, or up to five for a bigger line. With your maintenance team we walk the line and pick the parts that fail most often or that the line cannot run without. The most important ones are scanned on the spot. Anything with a catalogue number you buy from a supplier, and we never touch brakes, guards or interlocks.
Within 5 working days you get the list: risk, order and the price of each folder.
A folder for every part
3D scan, check dimensions, material, model and drawing. We test-fit a print in the machine, so you know it fits. Finally we agree who makes it and from what.
A simple part takes a few hours, a keyed gear 1-2 days, a complex assembly a few days.
When it breaks, one call is enough
The file goes to production, with us or with a partner. Nobody measures at night and nobody guesses dimensions.
Plastics from a few hours to 48 h, metal at a partner 3-5 working days. Indicative times.
The same failure, six days shorter.
With a ready folder nobody measures the broken part or draws it from scratch. Only production is left. Same line as above.
Drawing from scratch and production
c. PLN 104k
With a ready folder
c. PLN 42k
over PLN 60k less
for one failure, in this example
From a gear to a camera housing.
We recreate drive parts, difficult metal components, complex plastic parts, aluminium profile connectors, sensor brackets and camera housings. Once a part is in the warehouse, it can be improved without waiting for a failure: plastic instead of metal, lighter, a different mount, and the next version within days.
See our workThe files belong to your plant.
Any workshop can make the part from the folder: us, our partner or your own supplier. With a subscription we check once a year that the folders are up to date, because machines change, and when something fails your job goes first.
Let's start with one line.
The pilot covers one line and 5 to 10 parts. After 90 days you get the result in zloty: what a failure would have cost before and what it costs now. The first step is one review day at your plant.
Questions we hear most often
Do we need the machine documentation?
No. The part itself is enough, even a worn one, plus someone from maintenance who knows where it sits.
Where do you keep our files?
On a secured server in Poland, accessible only to the people you name. You can download everything at any time.
What about the machine maker's rights?
We document parts for your plant and your own use, where the maker no longer supplies them or it takes weeks. Before the review we check that your machine purchase agreement does not forbid it.
Why not 3D print everything?
Because only a few to a dozen or so percent of parts are suitable. We use printing for test fits and plastic parts. Metal is machined by CNC partners.
How much does it cost?
The review day has a fixed price. We compare the price of each folder with the cost of an hour of downtime that we work out together. If it does not pay off, we say so.
Book a review day
Tell us what you make and which machine stops most often. We will agree a date for the review.
- One day at your plant, at a fixed price
- A confidentiality agreement before the first visit
- A reply within one working day